Fabrication

Our Plants

We have four fabrication facilities in Oklahoma and Utah.


Plant Site Features

  • Highly-automated layout and material preparation lines using latest generation CNC equipment
  • Separate indoor and environmentally-controlled blasting (non-silica) at each facility
  • Indoor painting facility at each location
  • Our plants utilize our proprietary material handling system allowing the largest heaters and cogeneration units to be easily handled and maneuvered among multiple bays and loading docks
  • Improved quality and delivery schedules maintained due to majority of work performed inside and assisted with CNC automation
  • Big Cabin Facility utilizes assembly line indoor sequencing of insulate-blast-paint processes 

Centrally Located

  • Rail and water transportation capabilities
  • Port of Catoosa on the McClellan-Kerr Navigation Project Rail connects to the Mississippi Project and then to open seas through New Orleans
  • Three major rail lines (BNSF, KCSR & UP) intersect in Tulsa to provide access to all American and Canadian lines
  • Express facilities border major highways
  • Locust Grove site is on U.S. Highway 412
  • Big Cabin plant is located at the intersection of U.S. Highway 69 and Interstate 44
  • Interstate 44 and direct connections to I-35 allows us to truck to any part of North America

EMF Facility 1 (Locust Grove, Oklahoma) Features

Total square footage under roof - 79,802 sq. ft.

Building Bays -
  • 5,800 sq. ft. Warehouse with 2 Working Levels
  • 33-acre Improved Gravel Yard
  • 16,600 sq. ft. Concrete Work Slab
  • 6,000 sq. ft. Office
  • Security Fenced
  • Video Surveillance

This Building is 30' tall at eaves and consists of the following:

  • (1) Installation Bay 25' x 87'
  • (1) Sandblasting Bay 25' x 87'
  • (2) Paint Booths 25' x 87'
  • (3) Finish Bays at 25' x 87' 
  • (1) Paint Kitchen at 15' x 87'
  • (1) Tool Area at 11' x 87'
  • 2-acre track transfer, finished goods transfer and storage capacity
  • 400,000 # Load-Out Facility (future)

EMF Facility 2 (Big Cabin, Oklahoma) Features

Total square footage under roof - 84,140 Sq. Ft.

Building Bays -
  • 8,640 sq. ft. Warehouse with 2 Working Levels
  • 24-acre Plant with Improved Gravel Yard Over Entire Property
  • 2,000 sq. ft. Office
  • 8,000 sq. ft. Concrete Work Slab
  • Security Fenced

This Building has 25' clearance and consists of the following:

  • (2) Insulation Bays 27' x 100'
  • (2) Sandblasting Bays 27' x 120'
  • (2) Paint Booths 27' x 100'

SGS North Facility (Murray, Utah) Features

  • 58,890 sq. ft. Enclosed Fabrication Area
  • 13-acre Open Yard Area

SGS South Facility (St. George, Utah) Features

  • 75,000 sq. ft. Enclosed Fabrication Area
  • 21,250 sq. ft. Enclosed Surface Finishing Room
  • 2,000 sq. ft. Enclosed Blast Room
  • 11-acre Open Yard Area

On-Time Delivery

Our highly-experienced project managers work diligently to keep projects on schedule.  We maintain continuous effective communication with our customers and vendors to ensure all parties involved are kept up to date and provide a channel of communication for information sharing.